Record of Decision

The Federal Highway Administration (FHWA) approved Port St. Lucie’s plan to build the Crosstown Parkway extension bridge over the St. Lucie River at the city’s locally preferred route, known as 1C. The formal ruling is called a Record of Decision (ROD).

With this ruling, the City was able to move forward with property acquisition efforts and construction of several environmental improvement projects in state recreation areas that must be completed before construction of the bridge begins.

Mitigation
Lessening the impact on the environment during construction is extremely important. In order to meet mitigation requirements for this project, any property cleared will be recreated on site or at another location.

Mitigation Projects:

Mitigation Project Map: A map overview of the proposed proprietary mitigation projects including water quality sites, land acquisition sites and recreation opportunities.

Platts Creek Compensatory Mitigation: The Platts Creek Compensatory Mitigation (PCCM) project constructed 47.87 acres of wetland mitigation.

Baffle Box Project:  Baffle Boxes capture a wide variety of pollutants including TSS, sediment, debris, organic material, trash and hydrocarbons while maintaining water flow. Baffle Boxes were installed at five locations that directly discharge into the North Fork of the St Lucie.

Canoe/Kayak Launch:  This project relocated the existing facility approximately 1000-feet south. The proposed improvements include paved access road & parking area and ADA accessible canoe launch.

Savannas Recreation Trail:   This project constructed a trail starting at the Savanna Recreation Area Campground located on Midway Road. The trail is a segment of the East Coast Greenway which is a multi-state trail that connects Calais, Maine to Key West,Florida.

Savannas Education Center:  Improvements to the Savannas Education Center include a 3000 sf building addition, concrete parking, an observation deck and improved trail.

Water Quality ProjectsSedimentation will be removed from Evans Creek and two oxbows in the North Fork of the St. Lucie River. The removal will provide improved flows and hydration of the surrounding wetlands.

Project Development and Environment (PD&E) Study and Environmental Impact Statement (EIS) Documents

REPORTS

FINAL ENVIRONMENTAL IMPACT STATEMENT
FEIS Signed Cover Page
FEIS Table of Contents
FEIS Section 1.0 Summary
FEIS Section 2.0 Purpose of and Need for Action
FEIS Section 3.0 Alternatives Including Proposed Action Pages 1-90
FEIS Section 3.0 Alternatives Including Proposed Action Pages 91-180
FEIS Section 4.0 Affected Environment
FEIS Section 5.0 Environmental Consequences Pages 1-81
FEIS Section 5.0 Environmental Consequences Pages 82-162
FEIS Section 6.0 Section 4(f) Evaluation
FEIS Section 7.0 Avoidance, Minimization and Mitigation
FEIS Section 8.0 Comments and Coordination
FEIS Section 9.0 Commitments and Recommendations
FEIS Section 10.0 List of Preparers
FEIS Section 11.0 List of Agencies to Whom Copies are Sent
FEIS Section 12.0 Index
FEIS Appendix A Correspondences and Coordination
FEIS Appendix B First Advance Notification Packages and Responses
FEIS Appendix C Second Advance Notification Package and Responses
FEIS Appendix D Agency Comments from Final Programming Screen
FEIS Appendix E Resolutions
FEIS Appendix F Water Quality Impact Evaluation Checklist
FEIS Appendix G Tunnel Concept Report
FEIS Appendix H Concept Plans Part 1 of 2
FEIS Appendix H Concept Plans Part 2 of 2
FEIS Appendix I Public Meeting Summaries and Minutes – Part 1 of 2
FEIS Appendix I Public Meeting Summaries and Minutes – Part 2 of 2
FEIS Appendix J Land Use Map
FEIS Appendix K Planning Consistency
FEIS Appendix L MOU and MOA
FEIS Appendix M Mitigation (Proprietary Part 1)
FEIS Appendix M Mitigation (Proprietary Part 2)
FEIS Appendix M Mitigation (Regulatory)
FEIS Appendix N Comments rec after DEIS NOA – Part 1 of 2
FEIS Appendix N Comments rec after DEIS NOA – Part 2 of 2
FEIS Appendix O Public Hearing Transcript

TECHNICAL SUPPORT DOCUMENTS
Air Quality Report JUNE 2013
Alternatives Report (Part II of II) Part 1 of 2
Alternatives Report (Part II of II) Part 2 of 2
Conceptual Stage Relocation Plan
Contamination Screening Evaluation Report
Corridor Analysis
Cultural Resource Assessment Survey
Design Traffic Technical Memorandum (DTTM)
Endangered Species Biological Assessment (ESBA)
Essential Fish Habitat (EFH)
Location Hydraulic Report Part 1 of 2
Location Hydraulic Report Part 2 of 2
Noise Study Report JUNE 2013
Pond Siting Report Part 1 of 2
Pond Siting Report Part 2 of 2
Preliminary Drainage Report
Preliminary Geotechnical Report
Right of Way Remediation Report (FDOT) Part 1 of 3
Right of Way Remediation Report (FDOT) Part 2 of 3
Right of Way Remediation Report (FDOT) Part 3 of 3
Socio Cultural Effects Report Part 1 of 2
Socio Cultural Effects Report Part 2 of 2
Tunnel Concept Report
Utility Assessment Package
Wetlands Evaluation Report (WER)

MITIGATION APPENDICES FOR ESBA, EFH, AND WER
Mitigation (Proprietary Part 1)
Mitigation (Proprietary Part 2)
Mitigation (Regulatory)

DESIGN TRAFFIC TECHNICAL MEMORANDUM (DTTM) APPENDICES
Appendix I – Methodology Letter of Understanding
Appendix II – Bi-Directional Traffic Counts
Appendix III – Peak Hour Turning Movement Counts Part 1 of 2
Appendix III – Peak Hour Turning Movement Counts Part 2 of 2
Appendix IV – 2008 Prima Vista Vehicle Classification Counts Part 1 of 2
Appendix IV – 2008 Prima Vista Vehicle Classification Counts Part 2 of 2
Appendix V – FDOT and St. Lucie County Historic AADT
Appendix VI – Intersection Signal Timing
Appendix VII – Crash Data Part 1a of 10
Appendix VII – Crash Data Part 1b of 10
Appendix VII – Crash Data Part 2a of 10
Appendix VII – Crash Data Part 2b of 10
Appendix VII – Crash Data Part 3 of 10
Appendix VII – Crash Data Part 4a of 10
Appendix VII – Crash Data Part 4b of 10
Appendix VII – Crash Data Part 5a of 10
Appendix VII – Crash Data Part 5b of 10
Appendix VII – Crash Data Part 6 of 10
Appendix VII – Crash Data Part 7 of 10
Appendix VII – Crash Data Part 8 of 10
Appendix VII – Crash Data Part 9 of 10
Appendix VII – Crash Data Part 10 of 10
Appendix VIII – Travel Time Runs
Appendix IX – 2008 Synchro HCM Intersections LOS Output 8-7-09
Appendix X – Base Year (2008) Arterial LOS
Appendix XI – Base Year (2008) CORSIM Outputs Part 1 of 4
Appendix XI – Base Year (2008) CORSIM Outputs Part 2 of 4
Appendix XI – Base Year (2008) CORSIM Outputs Part 3 of 4
Appendix XI – Base Year (2008) CORSIM Outputs Part 4 of 4
Appendix XII – 2000 Validated TCRPM Refinements
Appendix XIII – 2017 and 2037 Model Forecasts
Appendix XIV – Historic Growth Rates
Appendix XV – TM Tools Field K and D
Appendix XVI – TM Tools Forced K and D
Appendix XVII – Future Conditions Synchro Intersection Outputs Rev July 2012
Appendix XVIII – Future Conditions Synchro Arterial Analysis Rev July 2012
Appendix XIX – Future Conditions CORSIM Outputs Part 1 of 5
Appendix XIX – Future Conditions CORSIM Outputs Part 2 of 5
Appendix XIX – Future Conditions CORSIM Outputs Part 3 of 5
Appendix XIX – Future Conditions CORSIM Outputs Part 4 of 5
Appendix XIX – Future Conditions CORSIM Outputs Part 5 of 5